Saturday, March 28, 2009
Rora's activities in the past few weeks
Posted by Amelia and Erik Lambson at 9:22 AM 6 comments
Monday, March 2, 2009
Our home, two years in the making.
Here is the tile and wood laminate flooring that we used downstairs.
.jpg)
One of the first things we did in the house was replace the back door. We had a broken sliding door that was not very energy efficient.
.jpg)
Erik's dad replaced it with a beautiful single french door. . .
then Erik finished it up with custom windows on each side of the door.
Erik and I also painted the walls soon after we moved in. This is our living room before. . .
and this is after the recent new flooring and and inherited couches.
This is the front entry in mid-demolition. . .
and here it is with the beautiful new tile and new base boards.
Here is more of the new tile in the dinning room.
Here is the great crown molding that Erik installed himself last summer.
This is our half-bath in mid-demolition.
more of the new tile in the half-bath
And here is the new sink in the half-bath with the new tile accent behind it that Erik put in. (it still needs some grout in the cracks)
.jpg)
The is our original kitchen when we moved in.
Erik and I worked long hours taking apart the cabinets, sanding, painting, sanding, painting, sanding, again and again.
We also replaced the counter tops and the sink.
Posted by Amelia and Erik Lambson at 9:35 AM 9 comments
Subscribe to:
Posts (Atom)
.jpg)